POST /projects/{projectId}/scenarios/{scenarioId}/gantt-pdf

Headers

  • X-COMPANY-ID string Required

    The company's unique ID

Path parameters

  • projectId integer(int64) Required
  • scenarioId integer(int64) Required
application/json

Body Required

  • paperSize string

    Values are Letter_Portrait, Letter, Legal, Tabloid, ArchD, or ArchE.

  • periodFrom string(date)
  • periodTo string(date)
  • dataDate string(date-time)
  • planned boolean
  • filterId array[integer(int64)]
  • ganttStructure string

    Values are WBS, ACTIVITY_CODE, or NONE.

  • searchTerm string
  • groupByCollapsedIds array[string]
  • groupByActivityCodeTypeIds array[integer(int64)]
  • sortByColumn string

    Values are ACTIVITY_ID, ACTIVITY_NAME, ACTUAL_DURATION, BLENDED_START_DATE, BLENDED_END_DATE, ACTUAL_START_DATE, ACTUAL_END_DATE, LATE_START_DATE, LATE_END_DATE, PERCENT_COMPLETE, DURATION_PERCENT_COMPLETE, PHYSICAL_PERCENT_COMPLETE, DURATION_VARIANCE, UNITS_PERCENT_COMPLETE, TOTAL_FLOAT, FREE_FLOAT, PLANNED_START_DATE, PLANNED_END_DATE, PLANNED_DURATION, DURATION, REMAINING_DURATION, START_DATE, END_DATE, NATIVE_FLOAT_TOTAL, IN_LONGEST_PATH, SOURCE_START_DATE, SOURCE_END_DATE, ROLLED_BACK_REMAINING_DURATION, SOURCE_ACTUAL_START_DATE, SOURCE_ACTUAL_END_DATE, BASELINE_START_DATE, BASELINE_END_DATE, BASELINE_DURATION, PLANNED_BUDGET, PLANNED_MANPOWER, BASELINE_FLOAT, BASELINE_NATIVE_FLOAT, or FLOAT_VARIANCE.

  • sortDirection string

    Values are ASC or DESC.

  • columns array[object]
    Hide columns attributes Show columns attributes object
    • column string

      Values are ACTIVITY_ID, ACTIVITY_NAME, ACTUAL_DURATION, BLENDED_START_DATE, BLENDED_END_DATE, ACTUAL_START_DATE, ACTUAL_END_DATE, LATE_START_DATE, LATE_END_DATE, PERCENT_COMPLETE, DURATION_PERCENT_COMPLETE, PHYSICAL_PERCENT_COMPLETE, DURATION_VARIANCE, UNITS_PERCENT_COMPLETE, TOTAL_FLOAT, FREE_FLOAT, PLANNED_START_DATE, PLANNED_END_DATE, PLANNED_DURATION, DURATION, REMAINING_DURATION, START_DATE, END_DATE, NATIVE_FLOAT_TOTAL, IN_LONGEST_PATH, SOURCE_START_DATE, SOURCE_END_DATE, ROLLED_BACK_REMAINING_DURATION, SOURCE_ACTUAL_START_DATE, SOURCE_ACTUAL_END_DATE, BASELINE_START_DATE, BASELINE_END_DATE, BASELINE_DURATION, PLANNED_BUDGET, PLANNED_MANPOWER, BASELINE_FLOAT, BASELINE_NATIVE_FLOAT, or FLOAT_VARIANCE.

    • columnWidth integer(int32)
  • timelineScale string

    Values are DAILY, WEEKLY, MONTHLY, or QUARTERLY.

  • additionalActivityIds array[integer(int64)]
  • includeDeleted boolean

Responses

  • 200 */*

    OK

POST /projects/{projectId}/scenarios/{scenarioId}/gantt-pdf
curl \
 --request POST 'https://live.smartpmtech.com/projects/{projectId}/scenarios/{scenarioId}/gantt-pdf' \
 --header "X-API-KEY: $API_KEY" \
 --header "Content-Type: application/json" \
 --header "X-COMPANY-ID: string" \
 --data '{
  "paperSize": "Letter_Portrait",
  "periodFrom": "2026-05-04",
  "periodTo": "2026-05-04",
  "dataDate": "2026-05-04T09:42:00Z",
  "planned": true,
  "filterId": [
    42
  ],
  "ganttStructure": "WBS",
  "searchTerm": "string",
  "groupByCollapsedIds": [
    "string"
  ],
  "groupByActivityCodeTypeIds": [
    42
  ],
  "sortByColumn": "ACTIVITY_ID",
  "sortDirection": "ASC",
  "columns": [
    {
      "column": "ACTIVITY_ID",
      "columnWidth": 42
    }
  ],
  "timelineScale": "DAILY",
  "additionalActivityIds": [
    42
  ],
  "includeDeleted": true
}'
Request examples
# Headers
X-COMPANY-ID: string

# Payload
{
  "paperSize": "Letter_Portrait",
  "periodFrom": "2026-05-04",
  "periodTo": "2026-05-04",
  "dataDate": "2026-05-04T09:42:00Z",
  "planned": true,
  "filterId": [
    42
  ],
  "ganttStructure": "WBS",
  "searchTerm": "string",
  "groupByCollapsedIds": [
    "string"
  ],
  "groupByActivityCodeTypeIds": [
    42
  ],
  "sortByColumn": "ACTIVITY_ID",
  "sortDirection": "ASC",
  "columns": [
    {
      "column": "ACTIVITY_ID",
      "columnWidth": 42
    }
  ],
  "timelineScale": "DAILY",
  "additionalActivityIds": [
    42
  ],
  "includeDeleted": true
}
Response examples (200)
42